New This Week:

Johnson St.: Concrete work on ADA ramps, curbs, milling, and paving between Guadalupe St. and Grant Avenue;  April 3, 2019 to May 6, 2019; 8:00am – 7:00pm (Weather permitting)

Single lane roadway with flaggers and some full closures.

Avenida De Las Campanas to the north east corner of Camino Principe  to Bellamah Dr.; April 15, 2019 to April 19, 2019; 8:30 am to 4:30 pm; Shoulder work.

Cerrillos Rd. at Chama: March 28.2019 to April 12, 2019; 8:30 am to 4:30 pm;  

West bound Cerrillos Rd turn bay going north on to St. Michael’ Dr. will be impacted, delays on Cerrillos are to be expected.

Galisteo at De Vargas: March 28, 2019 to April 30, 2019; 8:30 am to 4:30 pm; shoulder work,  north bound turn bay to De Vargas will be closed    

Cerro Gordo and Camino Gonzales; March 28, 2019 to April 4, 2019; 8:30 am to 4:30 pm; Flagging will be used in all four directions

On-going:

Galisteo Rd; Milling and paving between Rodeo Road and Zia road March 27, 2019 to April 5, 2019 (weather permitting)7:00am – 7:00pm;The road will be reduced to one lane with a Flagger operation in place in some areas. Expect Delays; if possible, please seek an alternate route.

Calle Lorca: Concrete work at the intersection of Calle Lorca and San Mateo March 18, 2019 to April 1, 2019 (Weather permitting);8:00am – 5:00pm;The roadway will be reduced to a single lane with no turn bays on San Mateo. Expect delays; if possible, please seek an alternate route

Siler Road: Water Main replacement between Cerrillos Rd and Agua Fria St.; October 1, 2018 to end of May 2019; 8:30 am – 4:30 pm (Weather Permitting); lane shift 

South Meadows: Installation of turn lanes; Agua Fria St. to the 599 round-about.   March 11, to April 30.2019; 8:30 am – 4:30 pm; traffic controls will be up for the duration of the project; shoulder work with times of lane shifts 

Old Santa Fe Trail: Installation of fiber optics lines between Coronado and Camino Pinones; February 28, 2019 to April 28, 2019;   8:30 am to 4:30 pm; Flagger operation 

 Acequia Madre: Installation of fiber optics lines between Garcia St and Calle Corvo; February 28, 2019 to April 28, 2019;  8:30 am to 4:30 pm; Flagger operation 

Cerrillos Rd: Installation of aerial cable; San Felipe to Siler Rd.; November 2018 to Completion Date; 8:30 am- 4:30 pm;Shadow truck setup

Cerrillos Rd: Installation of aerial cable; St. Michael’s Dr. and 3rd St.; March 18,2019 to May 18, 2019; 8:00am to 4:30 pm. Single lane closure

Warner Ave: Installation of aerial cable; Crossing St. Michael’s Dr.; March 18,2019 to May 18, 2019; 8:00 am to 4:30 pm. Single lane closure

Don Gaspar Ave: Installation of aerial cable; E. Coronado Rd. and W. Cordova Rd.

March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.: Shoulder work

Old Santa Fe Trail: Installation of aerial cable; Camino Pinones east bound to the curve; March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.: Shoulder work

Alameda St.:  Open trench to run conduit; Don Gaspar and De Vargas; March 18, 2019 to March 29, 2019; 8:00 am to 4:30 pm; Flagman work

Jemez Rd.: Installation of aerial cable; Airport Rd. to Agua Fria St.; 8:00 am - 4:30 pm; March 13, 2019 to May 19, 2019

Cerrillos Rd.; Installation of aerial cable; Vegas Verdes and Richards Ave.; March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.; Shadow truck setup

Old Pecos Trail and Old Santa Fe Trail: Installation of aerial cable ; March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.; March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.; Shadow truck setup

Coronado: Installation of aerial cable; Don Gasper and Old Pecos Trail; March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.; March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.; Shoulder setup

Arroyo Tenorio: Installation of aerial cable; Don Gasper and Old Pecos Trail; March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.; March 18, 2019 to May 18, 2019; 8:00 am to 4:30 pm.; Flagger setup

 

     

 

 

You Are Now Leaving The City of Santa Fe Website

Links to external, or third party web sites, are provided solely for visitors' convenience. Following links to other sites is done so at your own risk and the owners of this Website accept no liability for any linked sites or their content.

Any link from the our site to an external web site does not imply that we endorse or accept any responsibility for its use. It is important for users to take necessary precautions, especially to ensure appropriate safety from viruses, worms, trojans and other potentially destructive items. Users should review the privacy policies of external web sites and other terms of use to learn more about what, why and how they collect and use any personally identifiable information.

 

Open Alert