CONSTRUCTION Updates
Share this page Print this page

Bids/RFPs

New Southside Transit Center CIP #667

Bid Number: 21/12/B
Status: Open
Close Date: 10/27/2020 2:00 PM
Project Manager:
Anson Rane
505.955.5935
Proposal Submission Information:
See Bid/RFP documents for additional submission details.
City of Santa Fe Purchasing Office 200 Lincoln Ave., Room 122 Santa Fe, NM 87505

The Scope of Bids is the Work indicated in the Construction Documents together with all related work required for comprehensive, fully

functioning, warrantied utility and building elements, systems and finishes and includes, but is not limited to the following:

1. Demolition of portions of existing building components, existing concrete drives, landscaping and other various site improvements as

shown on the bid documents.

2. Earthwork, grading and compaction for the new concrete bus drives and passenger platforms.

3. Construction of new concrete drives and passenger platforms.

4. Construction of subsurface infrastructure, including drain lines, piping and other related utilities.

5. New landscaping and irrigation systems.

6. Construction of concrete foundations for pre-manufactured bus shelters.

7. Assembly and erection of owner provided pre-manufactured bus shelters. A total of eight (8) shelters will be assembled and erected on

the passenger platforms. The shelters are partially unassembled and are stored at the Santa Fe Trails complex on Rufina St.

8. New interior improvements within the existing building, including new office areas, toilet rooms, lobby and other support spaces as

indicated on the bid documents.

9. Electrical demolition and new power, distribution and lighting as shown on bid documents.

10. Coordination with Public Service Company of New Mexico (PNM) as required

11. Coordination with the New Mexico Gas Company as required

12. Coordination with Century Link as required

13. Coordination with New Mexico NM811 and/or contracting with utility location providers as required.

14. Coordination with the Design Professional, City’s Facilities Division and Transit Department for periodic review of systems

installations.

15. Coordination with the City’s Water Division as required

16. Coordination with the City’s Waste Water Division as required

17. Coordination with City of Santa Fe ITT Department as required

18. Coordination with Tel/data installation Contractor as required.

19. Coordination with radio and wireless communications installation Contractor(s) as required

20. Coordination with 3rd party Special Inspections Agency: See Construction Documents for Scope.

21. Coordination with 3rd party HVAC Commissioning Agency.

22. Mobilization period(s)

23. Any other related work associated with this improvement and as drawn and specified in the Construction Documents

24. Provide all required materials testing.

25. Provide 12 month Contractor’s warranty on service, parts and labor.

26. Provide Manufacturer’s warranties on service, parts and labor.

27. Provide allowance for Allowance No. 1 for general construction contingency for the project.

28. If accepted by the Owner, provide for the construction of Alternate No. 1 – North Parking Lot

 

Related Documents:
addendum 1 [2.8 MB]
addendum 2 [227.5 K]
Plan Set [28.0 MB]
Tech Specs [3.2 MB]

STAY UP TO DATE

  • FIND US ON FACEBOOK
  • FOLLOW US ON TWITTER
  • SHARE
  • SEND US A MESSAGE

VIDEO & WEBCASTS

Video & Webcasts
Official Travel Site of Santa Fe, NM
  • UNESCO
  • Member of Creative Cities
    Network since 2005